Documenting extra work on a trade job

Extra work on a trade job: how to document a change

A customer asks for more work halfway through a job. Compare it with the original agreement and record the price, timing and approval before scheduling the change.

·

Photo: Ono Kosuki on Pexels

While you are replacing damaged flooring, the customer asks you to replace the skirting boards in the next room as well. Your team could bring the materials along on the same visit. If the final invoice just says “extra work”, it is hard to tell what was ordered and what it should cost. A short written change connects the request on site with the schedule and the invoice.

1. Compare the request with the confirmed order

Open the latest version of the quote or contract that the customer accepted. Note the item and room the request concerns. List the original work, the additions and any work that will be removed. If the skirting boards are already included, or the work is needed to put right a defect you caused, a new label alone does not make it chargeable as an extra. If the scope is unclear, check the contract before promising a price.

2. Give the customer a change they can approve

Record the order number, date, location and altered work. State the quantity and the price or how it will be calculated. If delivery, access or a follow-up visit changes, include that in the same message. Check how VAT must be shown and clearly communicate what the customer will pay. German consumer offers must show the total price under the Price Indication Ordinance.

In an example for a business customer, a change to order 24 adds six metres of skirting board in the next room. Materials cost 6 × €12 and fitting costs €38, or €110 before any applicable VAT. Allow roughly 45 minutes for the extra work. Say whether disposal or wall repairs are included. Get clear approval from the person authorised to agree the change. Keep that reply with the version it refers to.

3. Schedule approved changes

Tell the team which room, quantity and date the change covers. Before ordering materials, check that the price and timing have been confirmed. If the customer only says “Take a look”, leave the request pending. Do the same if someone on site has no authority to order changes. If something is preventing the work from going ahead, record it and discuss what to do next promptly.

Construction contracts within the meaning of § 650a of the German Civil Code (BGB) are subject to the specific change rules in §§ 650b and 650c. Those provisions govern the circumstances in which the customer can direct a change and how the price is adjusted. The agreed contract terms may also matter. If an extra is disputed, check which rules apply to that contract first.

On the invoice, connect the extra item to the order number and the approved change. If less work was done than agreed, or part of the original work was dropped, check the effect on the price. File evidence of the work, the agreed dates and any record of acceptance with the order. The customer can then match the invoice to the work they ordered and the changes they agreed.

Before scheduling

  • Can you identify what differs from the confirmed order?
  • Have you recorded how the price is set and what changes in the schedule?
  • Has the person authorised to decide approved the right version?
  • Are the team and the person preparing the invoice using the same version?

How to structure a quote · The difference between a quote and an invoice

Sources